01245 469941

  borehampc@hotmail.com

Archive for November, 2019

Boreham Interchange – Lane Closures overnight between 18 November to 4 December 2019

Prior to the main contract for the Boreham Interchange Works commencing early in 2020, Trial Investigation Works are to take place before and after Christmas. 

The works involve night time lane closures, to investigate the position of underground services, drainage and ground conditions. These works are required to minimise the risk of any unforeseen items when the main contract is commenced.

The works will take place over a period from the 18th November 2019 to the 4th December 2019

19/00729/FUL

Demolition of residential flats and store room. Construction of new Northern Access Road connecting to local highway north of the schools existing site. In addition a new pedestrian foot path will be created along with adjustment to internal access road/path positions. Relocation of existing running track included as part of the proposed works at Ormond House New Hall School The Avenue Boreham CM3 3HS

Planning Applications

20/01893/FUL

1. Single storey rear and two storey side extension, plus new open porch roof to front at 16 Church [...]

20/01863/LBC / 20/01862/FUL

Replacement of existing door and windows at Mount Maskall Generals Lane Boreham Essex CM3 3HW[...]

20/01861/FUL

Two storey side and part two storey, part single storey rear extensions at 19 Butterfield Road Boreh[...]